Lots of measuring with the frames, using a laser and plumb bob with a centre line string. I got a bit too excited and glued the bunk sides in without hanging frame C. Luckily I noticed straight away and removed bunk sides to allow The hanging Frame. I also put in Laminated Floor Beams
